The project entails upgrading the electrical systems for tenant improvements by replacing supply fans in two air handling units with modern fan wall systems. It also includes removing and re-feeding three automatic transfer switches from existing hospital ATS units and replacing the motor control center on the 4th floor with a new distribution board. The work aims to improve ventilation and electrical distribution while adhering to hospital safety and code requirements.
This tenant improvement project involves the replacement of supply fans in air handling units AHU-SB-08 (SPD) and AHU-SF-02 (Cath Lab) with new fan wall systems to enhance ventilation efficiency. Automatic transfer switches (ATS) numbers 8, 9, and 10 will be removed and re-fed from the existing hospital ATS units 20 and 21 to optimize power distribution. Additionally, the motor control center EMCC-4 located on the 4th floor will be replaced with a new distribution board to improve electrical control and reliability. All work must comply with hospital safety standards and electrical codes to ensure uninterrupted operation and patient safety.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in Denver — open one to see the scope, property details and photos, then submit a bid.
Denver businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Denver directory lists.
See every listed pro: Denver contractors.