The project requires installing a 4.5 kW residential photovoltaic system, including upgrading the main service panel to 125 amps and adding a battery backup unit. Main breaker replacement is not part of the scope. The installation must meet all relevant permitting and electrical standards.
This project involves the installation of a residential 4.5 kW photovoltaic (solar) system. The scope includes replacing the main service panel with a 125-amp panel to accommodate the new system. A battery backup unit will also be installed to provide energy storage and enhance system reliability. Note that the main breaker replacement is not required for this project. All work must comply with local permitting requirements and electrical codes to ensure safety and functionality.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in Stockton — open one to see the scope, property details and photos, then submit a bid.
Stockton businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Stockton directory lists.
See every listed pro: Stockton contractors.