This project involves excavating the city cleanout area to access and repair a damaged drop tee caused by root intrusion. The scope includes replacing or repairing about 3 linear feet of sewer service pipe, followed by proper backfilling and site restoration. All work must meet applicable plumbing codes and quality standards.
Excavate the area around the city cleanout to expose the drop tee and assess damage caused by root intrusion. Remove and repair the broken section of the sewer service line. Replace or repair approximately 3 linear feet of sewer service pipe as necessary. Backfill and properly compact the excavated area to restore site conditions. Ensure all work complies with local plumbing codes and standards.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in Stockton — open one to see the scope, property details and photos, then submit a bid.
Stockton businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Stockton directory lists.
See every listed pro: Stockton contractors.