This project involves the removal and capping of existing ductwork, safe disconnection of existing VAV boxes, and installation of new VAV boxes with updated controls. It also includes the installation of new ductwork and air distribution components, as well as new hot water heating supply and return piping for the VAV units. The scope concludes with thorough testing and balancing to ensure the HVAC system operates efficiently and effectively.
Perform removal and capping of existing ductwork as required. Safely disconnect and decommission existing Variable Air Volume (VAV) boxes. Furnish and install new VAV boxes along with updated control systems. Install new ductwork and air distribution components to ensure optimal airflow. Provide new hot water heating (HHW) supply and return piping dedicated to the VAV units. Conduct comprehensive testing and balancing of the entire HVAC system to verify proper operation and performance.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in Los Angeles — open one to see the scope, property details and photos, then submit a bid.