The project requires replacing one existing split HVAC system with a new unit installed in the same location. The new system must be no larger than 25% above the size of the current unit, ensuring minimal changes to the existing setup while meeting all relevant codes and standards.
BidBro wrote this title, summary and the project details below from the building permit, with software. They are not the words of the permit office or of the contractor, and the permit does not rate how well the work was done.
The permit’s own description: “E-permit: change-out split system to split system. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. No. Of systems is 1”
This project involves the removal of one existing split HVAC system and the installation of a new split system in the same location. The new unit must not exceed the size of the existing unit by more than 25%. All work shall comply with applicable codes and standards to ensure proper operation and safety. The installation should maintain the original footprint and connection points to minimize modifications to the existing infrastructure.
Get new projects like this by email, browse the local contractors BidBro lists near this project, or post your own project and request bids from local pros.
12 of the 789 projects BidBro lists in Stockton. Most are records from public building permits, not homeowners asking for bids. Open one to see the scope, and photos where the record has them.
Businesses in BidBro's Stockton directory whose profiles carry a business description, imported customer reviews, permit history or a trade license. Each profile says where the business is based.
See every listed pro: Stockton contractors.