The project requires the installation of a 5.42 MW AC ground-mounted solar PV system paired with a 3 MW AC battery storage system capable of providing six hours of energy storage. The work includes all aspects of site preparation, equipment installation, electrical integration, and compliance with relevant standards to deliver a fully operational commercial renewable energy facility.
This project involves the installation of a commercial-scale ground-mounted photovoltaic (PV) system with a capacity of 5.42 MW AC (7.46 MW DC) alongside a 3 MW AC battery energy storage system with a 6-hour duration. The scope includes site preparation, mounting structure installation, PV module placement, electrical wiring, inverter setup, and integration of the battery storage system. The battery system must support energy storage and discharge capabilities for up to six hours to enhance grid reliability and energy management. All work must comply with applicable industry standards, safety regulations, and local codes to ensure a safe, efficient, and reliable renewable energy installation.
Browse the local contractors BidBro lists near this project, or post your own project and compare competing bids.
12 projects posted in Stockton — open one to see the scope, property details and photos, then submit a bid.
Stockton businesses with imported customer reviews, permit history or a trade licence on file — the same pros the Stockton directory lists.
See every listed pro: Stockton contractors.