Installation of 60-Foot Sewer Line with Connection to Main Sewer System
122 WILDROSE, SAN ANTONIO, TX, 78209
General Construction
This project involves installing a 60-foot sewer line and connecting it to the main sewer system. The scope includes excavation, pipe installation, backfilling, and testing to ensure compliance with relevant standards and reliable operation.